"Business for People & Project Industry"
FMC (OTI) License# 022107N
SMC Project Management LLC
21143 Hawthorne Blvd., #284
Torrance, CA 90503
United States
ph: 310-561-8833
SMC Project Management LLC has completed many logistics projects for our most valuable overseas and domestic clients. Transporting 100 metric ton transformers to small parcel, you are sure to trust SMC to get the job done safely, on time and under budget. Here are the pictures of SMC's most recent projects.
Project Volume: 875Pkgs / 5,644,239Lbs / 11,164 Cubic Meter
Service Scope: On Board & Dock Side Stevedoring, CFS Trans-Load, Heavy & Over-Size Transportation, Container Transportation and Crane Off-Load
Two Sets of 138/12.47KV 18/24/30 MVA Transformers
Weight : 169,996Lbs Each
Dim(in) : 343 x 146 x 178
Two sets of 169,996Lbs (ea) transformer & accessories delivery to Summit Substation for Austin Energy. Work scope included direct discharge two main units on-truck, heavy haul transportation and rigging on-pad (foundation).
Two Sets of 138-69/12,
47KV Transformers & Accessories
Weight: 180,000 Lbs each
Dim(in): 341 x 146 x 181
Two sets of 180,000Lbs (ea) transformer & accessories delivery to Koenig Lane Substation for Austin Energy. Work scope included direct discharge two main units on-truck, heavy haul transportation and rigging on-pad (foundation) with over-head crane & jack-N-slide.
Two Aux Transformers
Weight: 105,000 Lbs
Dim(in): 162 x 94 x 173
Rough-Set, On-Pad
operation by
350 Ton Mobile Crane
Two sets of transformer has been transported and set on-pad at nuclear power plant in Homestead, FL. Utilizing two 18" low profile 12 axle trailers to get road permit approved by state of Alabama & Florida that has extremely tough DOT height restriction.
Dryer Tower
Weight: 49,783Lbs
Dim(in): 512 x 131 x 158
Stripper Tower
Weight: 57,915Lbs
Dim(in): 813 x 131 x 161
Heat exchanger tower Dryer (1 unit) & Stripper (2 unit) set for solar energy plant have been transported from Salem, Va to Norfolk, VA for export to S. Korea. Stripper tower measured 68 feet in length & 13 feet 5 inches in height making the job extremely challenging to secure the equipment for the scope, but SMC and contracted carrier got it done to make promised vessel cut-off.
Two units of stainless steel tank for Samsung's Saturn Project was transported from west coast to Austin, TX.
300 Metric Ton Liebherr Crane along with boom & counter weights have exported from Port of Baltimore to Port of Pyungtak, S. Korea. Total size was 227 metric ton @ 630 cubic meter. Work scope included dock side stevedoring, load/brace/block onto liner mafi and ocean freight.
Weight: 19,000Lbs
Dim(in): 175 x 111 x 121
Over-Sized N2 Gas Purifiers / Haz CLS 4.2 / UN2881 / Metal Catalyst
Three units of Gas Purifier containing haz class 4.2 / UN2881 have been inland transported, trans-loaded to 40' & 20' ocean flat rack and exported. Metal Catalyst 4.2 is highly classified dangerous good which requires DOT Competent Authority for ocean transportation. Most transportation company does not have haz-mat license to handle class 4.2.
7400HP Pump Motor
Weight: 71,650 Lbs
Dim(in): 179 x 172 x 133
Two Sets 13600HP Motor Frame
Weight: 95,900 Lbs each
Dim(in): 202 x 124 x 120
Total three main units of pump motor & motor frame was delivered to Sandy Creek Power Plant in Riesel, TX. Scope included direct discharge & heavy haul delivery including all accessories.
Transporting 2 units of pump motor to SRP 4 Project from Port of Long Beach, CA to Springerville, AZ. Service Scope included CFS Trans-Loading, Permit Transportation & Police Escort.
We have crane yard located just off Long Beach Port to handle any type of heavy, over-sized & project shipments. Equipped with all types of heavy duty cranes upto 600M/T, nothing is impossible to handle with our Long Beach crane yard.
Door to Door U.S Intermodal Service

53' Temperature Controlled Partial Truck Load & LTL

SMC Project Management LLC is networked with multiple national freight carriers. Joint consortium with many asset based transportation companies, your valuable cargo will be handled most efficient and cost effective way.
Power Transformer
Plant Motor & Pump
Steel Structural Material including Beam, Pipe, Plate & Conveyor
Wind Energy Tower, Fan & Flange
Construction Equipment, Bull Dozer, Truck, Crane
Contact us today!
We welcome your questions and queries. Please refer to our contact information and contact us anytime. We are standing by 24/7 to answer your question.

Business for People & Project Industry
SMC Project Management LLC
21143 Hawthorne Blvd., #284
Torrance, CA 90503
United States
ph: 310-561-8833